Government House, Azerbaijan
Several Toshiba SMMS systems have been installed on imposing many-storied Government House in Baku. The Toshiba VRF equipment on this project delivers 3,8 MW of cooling (1340 НР).
Several Toshiba SMMS systems have been installed on imposing many-storied Government House in Baku. The Toshiba VRF equipment on this project delivers 3,8 MW of cooling (1340 НР).